Team efforts
To install the new line, extensive preparatory work was carried out at the Beko plant. It was necessary to design and build a foundation for the equipment, install an overhead conveyor to carry the flow of new housings to the paint shop, and provide all the necessary utilities – electricity, water cooling and compressed air systems, etc.
All of these tasks were handled by a large cross-functional team at Beko: chief engineer's department, construction department, welding department, and, of course, almost the entire technical development team. As a result, the majority of the work was carried out by the plant own resources, which allowed for significant savings in the infrastructure preparation budget.